MITN Purchasing Group (BidNet Direct)
AI Summary
Phase 2 of the Power Canal Sanitary project, a municipal wastewater or stormwater infrastructure improvement. Work likely includes excavation, pipeline installation, concrete structures, and related site utility construction along the Power Canal corridor.
Type: utility water sewer · Confidence: 45%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: MITN Purchasing Group (BidNet Direct) (mitn) on BidNet Direct Region: Michigan Published: 05/26/2026 Closing: 06/22/2026 Title: Power Canal Sanitary Phase 2 Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/444037568477/abstract?purchasingGroupId=8412351&origin=1(login required for documents)