Rocky Mountain E-Purchasing System
AI Summary
Phase 1b of the Farr Neighborhood development involving construction of service connections (water, sewer, storm) to serve residential lots. Work includes excavation, trenching, pipe installation, and concrete repairs/restoration.
Type: utility water sewer · Confidence: 65%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: Rocky Mountain E-Purchasing System (colorado) on BidNet Direct Region: Colorado Published: 05/28/2026 Closing: 06/25/2026 Title: Farr Neighborhood Phase 1b Service Connections Construction Detail:
https://www.bidnetdirect.com/colorado/solicitations/open-bids/Farr-Neighborhood-Phase-1b-Service-Connections-Construction/0000425912?purchasingGroupId=8409951&origin=1(login required for documents)