Massachusetts Purchasing Group (BidNet Direct)
AI Summary
Eastham Phase 1 Collection System Contract 1 involves construction of wastewater collection infrastructure including excavation, pipe installation, and ancillary structures. This is a public-sector utility project likely requiring site preparation, underground utility installation, and concrete work.
Type: utility water sewer · Confidence: 72%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: Massachusetts Purchasing Group (BidNet Direct) (massachusetts) on BidNet Direct Region: Massachusetts Published: 05/29/2026 Closing: 06/16/2026 Title: IFB - Eastham Phase 1 Collection System - Contract 1 Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/444042716501/abstract?purchasingGroupId=12556701&origin=1(login required for documents)