Tennessee Purchasing Group (BidNet Direct)
AI Summary
Design and construction of a concrete box beam bridge on U.S. 31E (S.R. 6, Nashville Pike) spanning East Fork Station Camp Creek at location mile marker 11.91 in Gallatin, Tennessee. Work includes site grading, drainage infrastructure, and approach paving to complete the bridge crossing.
Type: bridge · Confidence: 78%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: Tennessee Purchasing Group (BidNet Direct) (tennessee) on BidNet Direct Region: Tennessee Published: 06/01/2026 Closing: 06/26/2026 Title: The construction of a concrete box beam bridge on U.S. 31E (S.R. 6, Nashville Pike) over East Fork Station Camp Creek (L.M. 11.91) in Gallatin, including grading, drainage, and paving. Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/444045208248/abstract?purchasingGroupId=388528051&origin=1(login required for documents)