Washington Purchasing Group (BidNet Direct)
AI Summary
Design, permitting, and installation of battery electric bus (BEB) on-route charging infrastructure for Washington State transit systems. Work includes site preparation, electrical infrastructure, charging equipment installation, and integration with existing transit facilities.
Type: utility electric · Confidence: 72%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: Washington Purchasing Group (BidNet Direct) (washington) on BidNet Direct Region: Washington Published: 06/03/2026 Closing: 06/22/2026 Title: BEB On-Route Charging Infrastructure Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/444048331047/abstract?purchasingGroupId=700138901&origin=1(login required for documents)