Washington Purchasing Group (BidNet Direct)
AI Summary
Fire protection systems installation for Phase 2 of Sumner High School addition in Washington state. Scope includes design and installation of fire suppression, detection, and alarm systems to code.
Type: addition · Confidence: 65%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: Washington Purchasing Group (BidNet Direct) (washington) on BidNet Direct Region: Washington Published: 06/05/2026 Closing: 07/02/2026 Title: Sumner High School Addition PH2 FIRE PROTECTION Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/444050884048/abstract?purchasingGroupId=700138901&origin=1(login required for documents)