Massachusetts Purchasing Group (BidNet Direct)
AI Summary
Construction of water main interconnection infrastructure in Norwood, Massachusetts. Work includes excavation, pipe installation, and concrete work to connect water distribution systems.
Type: utility water sewer · Confidence: 72%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: Massachusetts Purchasing Group (BidNet Direct) (massachusetts) on BidNet Direct Region: Massachusetts Published: 06/18/2026 Closing: 07/01/2026 Title: Norwood Water Main Interconnection Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/444065867555/abstract?purchasingGroupId=12556701&origin=1(login required for documents)