Design-Builder (San Francisco Airport (Construction))
AI Summary
Paint steel elements, exposed conduits, and touch-up repaired surfaces for wayfinding enhancement installation at San Francisco International Airport Airtrain Stations. Work is part of a two-package program; this trade package covers painting scope for either 4 or 5 stations depending on package assignment.
Type: design build · Confidence: 85%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Reference: 11962.66 TP-1005 Department: Design-Builder Agency: San Francisco Airport (Construction) Portal: San Francisco International Airport — Construction on OpenGov Procurement Closes: 2026-07-04T00:00:00.000Z Released: 2026-06-19T07:00:00.000Z Detail:
https://procurement.opengov.com/portal/sfoconstruction/projects/275705Design-Builder Firm Name: Swinerton/Corgan Project Overview: Install new digital and static wayfinding elements with supporting metal frames and power and data for (9) Airtrain Stations.
Project will be let out in (2) Packages. Package #1 involves (4) Stations and Package #2 involves the remainder (5) Stations. Trade Package No.: TP-1005 Trade Package Title: Paint Description of the Trade Package
Scope of Work: Paint steel elements, exposed conduits and touch-up of repaired surfaces Trade Package Bid Due Date and Time: This advertisement is for Prequalification only - due date 7/3/26 Estimated Cost : $300,000 Main Trades of the Trade Package: Architectural Steel Frames CMD LBE Participation Requirement: 80% Design-Builder requirements or prequalification criteria: Prequalification with Swinerton required Use the following link to:
https://swinerton.com/subcontractor-prequalification/Contact for Trade Package information: Bob Deasy; robert.deasy@swinerton.com Design-Builder web link to the Trade Package or more information:
https://swinerton.com/subcontractor-prequalification/