Illinois Purchasing Group (BidNet Direct)
AI Summary
Multi-phase site improvement project including new bike path and sidewalk construction, retaining wall installation, curb and gutter replacement, asphalt milling and resurfacing, erosion control measures, and storm sewer construction and drainage adjustments.
Type: site work · Confidence: 65%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: Illinois Purchasing Group (BidNet Direct) (illinois) on BidNet Direct Region: Illinois Published: 05/15/2026 Closing: 06/02/2026 Title: Bike path, sidewalk and retaining wall construction, curb and gutter replacement, milling and resurfacing, erosion control and protection, drainage structure adjustments and construction, storm sewer construction Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/444021264497/abstract?purchasingGroupId=88021351&origin=1(login required for documents)