Washington Purchasing Group (BidNet Direct)
AI Summary
Comprehensive engineering design services for stream crossings reconstruction as part of post-fire disaster relief efforts in the Tunk Block Fire / Tunk Creek watershed area. Work includes survey, hydrologic analysis, and design documentation to restore stream crossing infrastructure damaged by wildfire.
Type: study consulting · Confidence: 65%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: Washington Purchasing Group (BidNet Direct) (washington) on BidNet Direct Region: Washington Published: 05/15/2026 Closing: 06/11/2026 Title: Tunk Block Fire Tunk Creek Rehabilitation Disaster Relief Project - Stream Crossings Reconstruction Comprehensive Engineering Design Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/444021380507/abstract?purchasingGroupId=700138901&origin=1(login required for documents)