California Purchasing Group (BidNet Direct)
AI Summary
Design services for El Modena Basin Area Improvements in California. Scope includes engineering design and surveying work to support future construction or infrastructure improvements in the basin area.
Type: study consulting · Confidence: 50%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: California Purchasing Group (BidNet Direct) (california) on BidNet Direct Region: California Published: 05/15/2026 Closing: 06/16/2026 Title: EL Modena Basin Area Improvements Design Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/444021077722/abstract?purchasingGroupId=88020151&origin=1(login required for documents)