Nevada Purchasing Group (BidNet Direct)
AI Summary
Reconstruction of aircraft apron pavement at Tonopah Airport in Nevada. Work likely includes removal of existing pavement, site preparation, drainage, and installation of new concrete or asphalt surface suitable for aircraft operations.
Type: paving · Confidence: 72%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: Nevada Purchasing Group (BidNet Direct) (nevada) on BidNet Direct Region: Nevada Published: 06/26/2026 Closing: 07/23/2026 Title: Tonopah Airport Apron Reconstruction Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/444074957565/abstract?purchasingGroupId=700135301&origin=1(login required for documents)