University of Houston
AI Summary
Structural repair and stabilization of the Hilton Hotel underground garage foundation system. Work includes concrete repairs, excavation, and installation of approximately 62 micropiles to mitigate future settlement and movement of the existing ramp structure.
Type: renovation · Confidence: 72%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: University of Houston on SciQuest / JAGGAER public portal Number: RFPCSP-730-UofH-3126 Type: RFPCSP
Contact: Eric Shen etshen@CougarNet.UH.EDU Open: 6/30/2026 3:00 PM CDT Close: 7/22/2026 3:00 PM CDT Detail (login may be required):
https://app01.jaggaer.com/apps/Router/ViewSourcingEvent?AuthToken=1%3AAES2%23CFfZ8Ew0Ya1uTCC639mszYLg2RweKYmZVWLw0Qh%2FEQ%2BRw97kmMQ8XvqSy%2BeqFQzDDWYyKA6PGIwap1vKKi%2BiP7oU2XVqnUrHgheoLVZvnvD2hC4zrFjlBzfHYkdQ9z5ud88O3BM6sXr1&tmstmp=1782909641750Stabilization of existing foundation system for the ramp to mitigate future movement. Perform concrete repairs, excavate and install 47 micropiles along the outside wall. Install another 15 micropile