INTERIOR, DEPARTMENT OF THE.BUREAU OF RECLAMATION.PACIFIC NW REGION PN 6615
AI Summary
Engineering study and analysis of cavitation damage to the turbine runner at Hungry Horse Power Plant, a federal hydroelectric facility. Work includes inspection, testing, design evaluation, and likely recommendations for repair or replacement of the turbine runner component.
Type: study consulting · Confidence: 72%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.