Washington Purchasing Group (BidNet Direct)
AI Summary
Phase 1 of a stormwater system maintenance project involving pre-cleaning of storm drain pipes and closed-circuit television (CCTV) inspections to assess pipe condition. Work likely includes jetting, vacuuming, and video documentation of stormwater infrastructure across one or more Washington locations.
Type: utility water sewer · Confidence: 68%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: Washington Purchasing Group (BidNet Direct) (washington) on BidNet Direct Region: Washington Published: 07/01/2026 Closing: 07/21/2026 Title: Stormwater Pre Cleaning and CCTV Inspections Phase 1 Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/444080786013/abstract?purchasingGroupId=700138901&origin=1(login required for documents)