Missouri Purchasing Group (BidNet Direct)
AI Summary
Installation of a parallel force main pipeline system, likely involving excavation, trenching, pipe laying, and concrete work for wastewater or water conveyance infrastructure. The project is a utility infrastructure upgrade or expansion.
Type: utility water sewer · Confidence: 62%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: Missouri Purchasing Group (BidNet Direct) (missouri) on BidNet Direct Region: Missouri Published: 07/01/2026 Closing: 07/27/2026 Title: TIN CUP PARALLEL FORCE MAIN Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/444079087909/abstract?purchasingGroupId=5611001&origin=1(login required for documents)