Mississippi Purchasing Group (BidNet Direct)
AI Summary
Repair work on Bridge No. 158.5 spanning the Tenn-Tom Waterway on MS 4 in Mississippi. Project likely involves structural assessment, concrete and/or steel rehabilitation, and related bridge restoration.
Type: bridge · Confidence: 62%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: Mississippi Purchasing Group (BidNet Direct) (mississippi) on BidNet Direct Region: Mississippi Published: 07/07/2026 Closing: 07/28/2026 Title: Bridge Repair on MS 4 over Tenn-Tom Waterway (Bridge No. 158.5) Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/444087003678/abstract?purchasingGroupId=5611151&origin=1(login required for documents)