Virginia Purchasing Group (BidNet Direct)
AI Summary
Design and/or construction of a power substation electrical facility. Work likely includes foundation preparation, structural steel erection, electrical equipment installation, and site utilities integration.
Type: utility electric · Confidence: 45%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: Virginia Purchasing Group (BidNet Direct) (virginia) on BidNet Direct Region: Virginia Published: 07/08/2026 Closing: 07/16/2026 Title: 61--POWER SUBSTATION,EL Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/2706398177/abstract?purchasingGroupId=182878751&origin=1(login required for documents)