Alabama Purchasing Group (BidNet Direct)
AI Summary
Phase 3 construction of a force main pipeline system in the Mercedes area. Work includes excavation, installation of concrete pipe or similar utility infrastructure, and site restoration. This is a municipal water/wastewater infrastructure project.
Type: utility water sewer · Confidence: 72%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: Alabama Purchasing Group (BidNet Direct) (alabama) on BidNet Direct Region: Alabama Published: 07/10/2026 Closing: 07/28/2026 Title: Mercedes Force Main Phase 3 Construction Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/444091002829/abstract?purchasingGroupId=388530651&origin=1(login required for documents)