Missouri Purchasing Group (BidNet Direct)
AI Summary
Replace the fire alarm system at Moberly Correctional Center, a correctional facility infrastructure project. Work includes removal of existing fire alarm equipment and installation of a new fire alarm system with associated electrical and low-voltage components.
Type: renovation · Confidence: 85%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: Missouri Purchasing Group (BidNet Direct) (missouri) on BidNet Direct Region: Missouri Published: 07/17/2026 Closing: 08/18/2026 Title: Replace Fire Alarm System, Infrastructure Moberly Correctional Center Moberly Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/444099625124/abstract?purchasingGroupId=5611001&origin=1(login required for documents)