City of Laredo
AI Summary
Engineering study and evaluation of floodplain and hydraulic conditions along approximately 41 miles of the Rio Grande corridor in Laredo, Texas, extending from the Colombia Solidarity Bridge to the South Laredo City Limits. Work includes regulatory compliance assessment and hydraulic analysis to support future infrastructure planning and permitting.
Type: study consulting · Confidence: 82%
Watch out for
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Source: City of Laredo on Ionwave Bid number: RFQ FY26-ENG-54 Type: RFQ Department: Engineering Department Issued: 7/19/2026 Closes: 9/3/2026 04:00:00 PM (CT) Title: Floodplain, Hydraulic, and Regulatory Evaluation – Rio Grande Corridor Colombia Solidarity Bridge to South Laredo City Limits (approximately 41 miles) Detail (login may be required):
https://cityoflaredo.ionwave.net/SourcingEvents.aspx?SourceType=1