Minnesota Department of Transportation
AI summary pending
This bid is queued for AI categorization. Trade tags, project type and a scope summary will appear here within ~30 minutes. The raw posting from the source portal is below.
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Title: Final Design, SP 2735-212 TH 100 Date posted: 08/04/2026 Due date: 08/28/2026 Primary document docID: 39186580 Brief
Description: State requests proposals for final design plans for the mill and overlay and concrete pavement rehabilitation of Trunk Highway (TH) 100 in the cities of St. Louis Park, Golden Valley, Crystal, Robbinsdale, and Brooklyn Center, MN as State Project (SP) 2735-212.
This project includes mill and overlay and concrete pavement rehabilitation on TH 100 between 26th St in St Louis Park and Interstate 694 in Brooklyn Center, removal of access at John Martin Dr. in Brooklyn Center, signal replacements at the intersections of the TH 100 ramps with Glenwood Ave. and Bass Lake Rd., sidewalk and curb ramp reconstruction, signing refresh and overhead sign structure replacement, and rehabilitation of 13 bridges.
The goal of this project is to develop complete final construction plans, specifications, and estimates for the mill and overlay project. The outcome will be a constructable final design package that includes a staging plan that has been modeled to determine the impacts of construction on the traveling public.
Source: Minnesota Department of Transportation, Professional/Technical Consultant Services notices page (
https://www.dot.state.mn.us/consult/notices.htmlOpen to all consultants unless the solicitation states pre-qualification is required.