Lane County [ open agency website in new window ]
AI summary pending
This bid is queued for AI categorization. Trade tags, project type and a scope summary will appear here within ~30 minutes. The raw posting from the source portal is below.
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
In general, the Scope of Work includes beginning with the 80% design development documents, finalize construction documents by preparing drawings, plans, specifications and other documents setting forth, in detail, the requirements for construction of the Project; develop and submit all permitting, bidding, and construction documents for the Project; provide a project cost estimate based on final designs; and provide Construction Contract Administration (CA) services including, but not limited to, site visits, reports, submittal review, construction document interpretation, and cost/payment review.
Initial 80% design drawings are attached to this solicitation. The successful offeror will receive the full CAD files. An environmental review is currently underway at this site which may take six to nine (6-9) months to complete. Plans may only be drafted to the 90% level before environmental review is finished. Once environmental clearance is received, a Notice to Proceed will be issued to allow for design work to be finalized.