City of Bellevue (WA)
AI summary pending
This bid has not been classified by trade yet. Classification runs for Wyoming plus every state with an active subscriber; elsewhere a bid stays pending until a subscriber for that state appears. The raw posting from the source portal is below.
Deep Document Summary
AI summary coming soon — we haven't processed this bid's documents yet. The full text and source link below have everything you need in the meantime.
Work contemplated to be performed under this contract is as follows: Demolition and removal of existing playground equipment, clearing and grading, new connections to existing stormwater pipes, domestic water line extension, new 2-5 year old playground installation with engineered wood fiber mulch and artificial turf safety surfacing, new 5-12 year old playground installation with engineered wood fiber mulch, artificial turf safety surfacing, and drainage improvements, prefabricated steel shelter installation, concrete and asphalt paving, portable restroom enclosure, new ornamental planting, modifications to and expansion of an existing irrigation system. Engineer's Estimate Range $970,000 - $1,030,000.
BidRanger is an independent aggregator, not affiliated with any government agency. Verify details on the official portal.