273,420bids
Back to bids
Open

SR 519, Seattle Trm - Terminal Electrification

Washington Purchasing Group (BidNet Direct)

AI summary

Terminal electrification work on SR 519 in Seattle. Project involves electrical infrastructure installation and upgrades to support electric transit operations at the terminal facility.

ElectricalLow voltageSite utilitiesGeneral contractor
CSI 26CSI 27CSI 31CSI 32

Project type: Electric utility · Confidence: 65%

AI-flagged requirements

  • Plans available only on BidNet Direct (login required)
  • Federal Davis-Bacon prevailing wages likely
  • Performance bond required
  • Payment bond required

AI document summary

Key Scope Items

  • Terminal electrification work at SR 519, Seattle Terminal
  • Project appears to involve electrical infrastructure upgrades or installation at a transportation terminal
  • (Description provides no further detail on specific scope, systems, or quantities)

Notable Requirements

  • None mentioned in the description.

Description

Source: Washington Purchasing Group (BidNet Direct) (washington) on BidNet Direct Region: Washington Published: 12/16/2025 Closing: 11/23/2026 Title: SR 519, Seattle Trm - Terminal Electrification Detail:

https://www.bidnetdirect.com/public/supplier/solicitations/statewide/443791626633/abstract?purchasingGroupId=700138901&origin=1

(login required for documents)

BidRanger is an independent aggregator and is not affiliated with any government agency. Confirm the details on the agency's official portal before you bid.