Construction of a pedestrian bridge over IL 19/Irving Park Rd., retaining walls and the construction of a multi-use path from Park St. to the Metra Roselle Station South Lot in the village of Roselle.
Illinois Purchasing Group (BidNet Direct)
Project type and trades
AI scope summaries cover Wyoming plus every state with an active subscriber.
Project type: Bridge
Description
Source: Illinois Purchasing Group (BidNet Direct) (illinois) on BidNet Direct Region: Illinois Published: 10/05/2026 Closing: 11/06/2026 Title: Construction of a pedestrian bridge over IL 19/Irving Park Rd., retaining walls and the construction of a multi-use path from Park St. to the Metra Roselle Station South Lot in the village of Roselle.
Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/444184733025/abstract?purchasingGroupId=88021351&origin=1(login required for documents)
BidRanger is an independent aggregator and is not affiliated with any government agency. Confirm the details on the agency's official portal before you bid.
AI document summary
We have not summarized this bid's documents yet. The full bid package is on the source portal.
More open bids in Illinois
- This project is located on FAP 326 (IL-47) in the Morris Wetland bank east of IL-47 and south of the Illinois River in Morris and consists of beaver guard removal.
Due Nov 6, 2026
- Construction of a single-span plate girder bridge carrying Furrow Road over Lost Creek. Work also includes HMA approach pavement, guardrail and other required work.
Due Nov 6, 2026
- Construction of multi-use PCC path along IL 13 from Airport Rd. to County Club/ Health Department Rd. in Jackson County.
Due Nov 6, 2026
- Removal of a bridge and replacement with double 9'X9' culverts, SN 053-0103, which carries IL 116 over Short Point Creek approximately 5.4 miles east of IL 251.
Due Nov 6, 2026
- Patching, paved shoulders, resurfacing and grading and shaping ditches on US 54 from 0.2 miles south of 345th Street, southwest of Pittsfield, to north of Jim Town Hollow Road in Summer Hill.
Due Nov 6, 2026
- 55.2 miles of pavement patching on IL 3 from Monroe to the Jackson County line and on IL 150 from the Mississippi River in Chester to the Perry County line.
Due Nov 6, 2026