TAN 675 Lighting Controls Upgrade

ENERGY, DEPARTMENT OF.ENERGY, DEPARTMENT OF.BATTELLE ENERGY ALLIANCE–DOE CNTR

AI summary

Upgrade of lighting controls systems at TAN 675 facility operated by Battelle Energy Alliance under Department of Energy contract. Work includes installation and integration of modern lighting control equipment and low-voltage systems.

ElectricalLow voltage
CSI 26CSI 27

Project type: Renovation · Confidence: 65%

AI-flagged requirements

  • Davis-Bacon Act applies to construction contracts >$2,000 at INL site
  • INL Site Stabilization Agreement (SSA) mandatory for work within 890-sq-mile INL boundary
  • SSA requires coordination with signatory unions: contact (208) 524-4404
  • EOI only: RFP invitations are selective; no guarantee of solicitation access
  • EOI deadline: January 29, 2027, submit to Chase.Egbert@inl.gov

AI document summary

Key Scope Items

  • Remove outdated lighting, controls, and switches at TAN-675 facility
  • Install new lighting control systems and associated hardware/software
  • Integrate with existing electrical infrastructure and building automation systems
  • Comply with DOE, NFPA, and applicable energy efficiency standards
  • Testing and commissioning of installed systems

Notable Requirements

  • Davis-Bacon Act applies for construction contracts exceeding $2,000 at INL site
  • INL Site Stabilization Agreement (SSA) applies: contractors must coordinate with signatory unions for work within the 890-square-mile INL boundary
  • SSA contact: Site Labor Coordinator (208) 524-4404 or lance@sitelabor.org
  • No bonding, insurance, or prequalification requirements stated at this stage (EOI only)

Critical Dates

  • EOI submission deadline: January 29, 2027, submit to Chase.Egbert@inl.gov
  • Formal RFP dates: Not yet specified

Red Flags

  • This is an Expression of Interest (EOI) only: not a solicitation; formal RFP invitation is selective and not guaranteed
  • INL Site Stabilization Agreement requires use of signatory union labor for on-site construction work; non-union contractors must evaluate compliance exposure before responding