Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)
Louisiana Purchasing Group (BidNet Direct)
AI summary
Maintenance dredging operations on the Mississippi River from Baton Rouge to the Gulf of Mexico, specifically in Southwest Pass between mile 6.0 AHP and mile 19.5 BHP. Work involves cutterhead dredge equipment (Dredge No. 4-2025) for sediment removal and navigation channel maintenance.
Project type: Maintenance · Confidence: 72%
AI-flagged requirements
- Plans available only on BidNet Direct (login required)
- Federal Davis-Bacon prevailing wages likely (USACE/waterway project)
- Performance bond and payment bond expected
- Large marine dredging equipment and operations experience required
- Two-year contract period (02/04/2025-02/03/2027)
Description
Source: Louisiana Purchasing Group (BidNet Direct) (louisiana) on BidNet Direct Region: Louisiana Published: 02/04/2025 Closing: 02/03/2027 Title: Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278) Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/2572111252/abstract?purchasingGroupId=182875151&origin=1(login required for documents)
BidRanger is an independent aggregator and is not affiliated with any government agency. Confirm the details on the agency's official portal before you bid.
AI document summary
We have not summarized this bid's documents yet. The full bid package is on the source portal.
More open bids in Louisiana
- Calcasieu River and Pass, Bar Channel Hopper Dredge Contract No. 1-2025, Cameron Parish, Louisiana. Specification Nos. OM25125
Due Dec 4, 2026
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)
Due Feb 3, 2027
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)
Due Feb 3, 2027
- Tiger Pass Dredging Over Utility Corridor, Plaquemines Parish,
Due Feb 5, 2027
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 3-2025 (OM25003)
Due Mar 23, 2027
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 2-2025 (OM25002)
Due Mar 23, 2027