Sidewalk construction, curb and gutter replacement, street lighting improvements, signing, pavement markings and landscaping along Hassell Rd. from Pembroke Ave. to Rosedale Lane, Pembroke Ave. from Hassell
Illinois Purchasing Group (BidNet Direct)
Project type and trades
AI scope summaries cover Wyoming plus every state with an active subscriber.
Project type: Site work
Description
Source: Illinois Purchasing Group (BidNet Direct) (illinois) on BidNet Direct Region: Illinois Published: 10/06/2026 Closing: 11/06/2026 Title: Sidewalk construction, curb and gutter replacement, street lighting improvements, signing, pavement markings and landscaping along Hassell Rd. from Pembroke Ave. to Rosedale Lane, Pembroke Ave. from Hassell Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/444184655586/abstract?purchasingGroupId=88021351&origin=1(login required for documents)
BidRanger is an independent aggregator and is not affiliated with any government agency. Confirm the details on the agency's official portal before you bid.
AI document summary
We have not summarized this bid's documents yet. The full bid package is on the source portal.
More open bids in Illinois
- 11.5 miles of resurfacing from LaSalle 0.3 miles west of IL 178 to west of Fox River on interstate 80 north of Ottawa
Due Nov 6, 2026
- Bridge and roadway reconstruction on US 20 over I-90 from 0.4 miles west of Wheeler Rd to 0.1 miles east of Ipsen Rd. Approximately 2.59 miles in length.
Due Nov 6, 2026
- Superstructure replacement (SN 032-0087 / 0086) on IL 47 Over Buchanan St and Armstrong St/CSX RR 0.6 Mi South of US 6 (west) in Morris.
Due Nov 6, 2026
- (2.75-Mile) Smart Overlay Improvements consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement
Due Nov 6, 2026
- Construction of a PCC shared-use path along 25th Avenue in the city of Moline
Due Nov 6, 2026
- Removal and replacement of rest area lighting at both the EB and WB Farmland Rest Areas in DeWitt County.
Due Nov 6, 2026