(2.75-Mile) Smart Overlay Improvements consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement
Illinois Purchasing Group (BidNet Direct)
Project type and trades
AI scope summaries cover Wyoming plus every state with an active subscriber.
Project type: Paving
Description
Source: Illinois Purchasing Group (BidNet Direct) (illinois) on BidNet Direct Region: Illinois Published: 10/06/2026 Closing: 11/06/2026 Title: (2.75-Mile) Smart Overlay Improvements consists of pavement patching) hot-mix asphalt surface removal, hot-mix asphalt resurfacing, placement of thermoplastic pavement markings and raised reflective pavement Detail:
https://www.bidnetdirect.com/public/supplier/solicitations/statewide/444184663578/abstract?purchasingGroupId=88021351&origin=1(login required for documents)
BidRanger is an independent aggregator and is not affiliated with any government agency. Confirm the details on the agency's official portal before you bid.
AI document summary
We have not summarized this bid's documents yet. The full bid package is on the source portal.
More open bids in Illinois
- Bridge and roadway reconstruction on US 20 over I-90 from 0.4 miles west of Wheeler Rd to 0.1 miles east of Ipsen Rd. Approximately 2.59 miles in length.
Due Nov 6, 2026
- Superstructure replacement (SN 032-0087 / 0086) on IL 47 Over Buchanan St and Armstrong St/CSX RR 0.6 Mi South of US 6 (west) in Morris.
Due Nov 6, 2026
- Sidewalk construction, curb and gutter replacement, street lighting improvements, signing, pavement markings and landscaping along Hassell Rd. from Pembroke Ave. to Rosedale Lane, Pembroke Ave. from Hassell
Due Nov 6, 2026
- Construction of a PCC shared-use path along 25th Avenue in the city of Moline
Due Nov 6, 2026
- Removal and replacement of rest area lighting at both the EB and WB Farmland Rest Areas in DeWitt County.
Due Nov 6, 2026
- 5.79 miles of designed overlay on US 6 from 0.1 miles west of Dilenbeck Dr to US 6 (E); and on ILL 82 from Smith St to 0.4 miles south of I-80 (including ramps)
Due Nov 6, 2026